Q1: Identify the bottleneck or bottlenecks in the process. Answer: We manner of walking out that the demand of berries next course of instruction is the bonnie periodic deliveries (1,365 lay per mo). As given in the part, trucks arrive the limit randomly, which nitty-gritty that no truck schedule is implemented and thither is no restriction on when the trucks should arrive (window time). We analyse the case base on the following assumptions. Assumption 1: The trucks load an average of 75 barrel per truck. The demand is equal to the average daily deliveries (16,380/12=1,365 barrels per mo). Given that the forecasts for the coming year for wet-harvested berries and dry-harvested berries were 70% and 30% respectively. We calculated the truck waiting time, workers overtime and analysed what additional equipment is needed as follows. Demand: Dry barrelsper hour= 1,365*30%=410 (roundup) Wet barrelsper hour= 1,365*70%=956 (roundup) add: 1365 barrels per hour Capacity list: |? |capacity(barrels per hour) | |Dumper |3,000 | |Dry sodium chloride away |4,000 | |wet bin |1,200 | |flexible bin |2,000 | |destoning |4,500 | |dechaffing |4,500 | ! |drying |600 | |seperating |1,200 | liken the contribute (dry and wet) demand and capacity |?...If you want to get a full essay, rules of order it on our website: OrderCustomPaper.com

If you want to get a full essay, visit our page: write my paper

No comments:

Post a Comment